Road Construction Project

The master layout is used in developing the road system and sidewalk according to the Green Campus concept, and it will connect every part into a network. In short term, the university plans to construct the road as follows:

1. Wirat Dutsadi Road connect the plantation plot to the road network inside the campus.

2. Road beside the Office of the President – provide access to the parking area behind the Office of the President. It will also connect to the Chitta Saman Road

3. Thin Witthayakan Road

4. Karunyamit Road

Wirat Dutsadi RoadRoad behind the Office of the President Thin Witthayakan Road Karunyamit Road